Prefab Man Camps
Workforce Industrial Housing Solutions
In the remote site sector, durability and speed are not optional—they are critical. Since 2007, APEC Modular has been engineering and manufacturing high-capacity housing solutions from our production facility in Yalova.
We distinguish ourselves from standard traders by controlling the entire lifecycle. From Prefab Workforce Housing design to the final bolt on-site, we deliver structural integrity using cold-formed galvanized steel technology. Whether you need a temporary fly-fly camp or a permanent township, our systems are built to withstand the harshest industrial environments.


Engineered for Efficiency: The Technical Advantage
Our Prefab Man Camps are not just containers; they are precision-engineered structures. We utilize fully automated CNC manufacturing lines to eliminate human error, ensuring every module fits perfectly during installation.
- Corrosion Resistance: We use high-grade steel with 275g/m² hot-dip galvanized zinc coating. This ensures your Prefab Labor Camps resist rust and corrosion significantly longer than standard welded black steel containers.
- Weld-Free Structure: Our unique bolted system requires no welding. This makes the structures easy to assemble, demount, and relocate to your next Prefab Remote Site Accommodation project with negligible material loss.
- Stackable Design: Maximizing limited site space, our modules are robust enough to be stacked up to three levels, ideal for high-density Large Man Camps.
Logistics & Deployment: Flat-Pack vs. Monoblock
Logistics costs can make or break a remote project. We offer flexible delivery methods tailored to your site’s accessibility:

Flat-Pack Delivery
- Capacity: We can load up to 12 units (600×240 cm) into a single truck.
- Speed: A single unit can be assembled by 4 workers in just 1 hour using simple tools.
- Ideal For: Prefab Fly-fly Camps and large-scale export projects.

Monoblock (Plug-and-Play)
- For sites requiring immediate occupancy, units are shipped fully assembled from our factory.
- Ready to Use: Electrical and sanitary systems are pre-installed.
- Ideal For: Urgent Prefab Workforce & Industrial requirements where on-site labor is scarce.
Comprehensive Solutions: More Than Just Sleeping Quarters
A functional camp requires integrated facilities. We design and manufacture compliant layouts that include:
Compliance and Engineering Excellence
We understand that industrial projects have strict regulations. APEC Modular ensures peace of mind through rigorous standards:
Structural Safety
Certified Production
Fire & Insulation

Our Project Portfolio: Proof in Practice
We have delivered complex modular solutions to some of the world’s most recognized brands and critical organizations. Our experience spans from industrial facilities to large-scale accommodation and military mobilization.
| Company | Status | Project Name | Location | Project Area |
| Migros | Completed | Store and Warehouse Buildings | Turkey | 4.000 m² & 200 m² |
| Unilever | Completed | Lipton Storage Space | Turkey | 2.200 m² |
| Coca Cola | Completed | Bottling Plant | Turkey | 14.000 m² |
| Doğanlar Holding | Completed | State Structure | Dakar / Senegal | 55.000 m² |
| Carrefour | Completed | Store | Turkey | 2.800 & 2.050 m² |
| Millennium Hotels | Completed | 7-storey Hotel Building | Gine | 7.000 m² |
| Nato (Canadian Army) | Completed | Military Mobilization | Latvia | 5.500 m² |
| Libya Ministry of Religious Affairs | Completed | Administrative Building | Libya | 5.500 m² |
| Polisan | Completed | Office Building | Turkey | 800 m² |
| Eti | Completed | Warehouse Building | Turkey | 1.000 m² |
| JCB | Completed | PDI Building | Turkey | 720 m² |
| Siemens | Completed | Warehouse | Turkey | 750 m² |
