Turnkey Camp Solutions
APEC MODULAR: More Than Just Buildings. We Deliver Your Entire Remote Site.
Let’s be honest. Launching a major project in the middle of nowhere is a logistical nightmare. That’s the part they don’t always put in the brochure. If you’re in mining, oil & gas, or heavy construction, you know that just setting up the site—managing all the vendors, the timelines, the delays—is a high-risk, high-stress job. It’s a job that can derail your entire project before it even begins.
This is the problem Apec Modular was built to solve. We take that entire, complex mobilization phase off your shoulders with a single, comprehensive Turnkey Camp Solution. We handle the mess; you focus on your mission.
 
															 
															What "Turnkey" Actually Means in the Real World
“Turnkey” gets thrown around a lot. For us, it’s not just a sales pitch; it’s a promise of a single point of accountability.
Think about that. Instead of five different contractors blaming each other for a delay, you have one phone call. Ours. It means we take responsibility for the entire build, from the first site survey to the day we hand you the keys to a facility where the lights are on, the water is running, and your crew can get to work. It’s about de-risking your project, guaranteeing your budget, and hitting your mobilization date. No excuses.
Our Field-Proven Process: How We Build Your Camp
A successful camp doesn’t happen by accident. It’s built on a process that’s been tested and refined in the toughest environments.

Phase 1: Strategy & Engineering (The Blueprint)
We don't start by showing you a catalog. We start by asking questions. How many people? What's the climate? What are the local regulations? Our engineers design a complete master plan that’s built for operational efficiency, not just shelter.

Phase 2: Off-Site Manufacturing (The Speed)
This is where we change the game. While your site is being prepared, we're already building your modules in our factory. This parallel workflow, safe from weather and on-site chaos, is how we cut project timelines by up to 50%.

Phase 3: Global Logistics (The Muscle)
Getting critical assets to a remote site is an art form. Our logistics team has moved camps across continents and deserts. We manage the entire supply chain to ensure everything arrives safely, in the right order, and on time.

Phase 4: Installation & Commissioning (The Finish)
Our site teams take over. They handle foundations, assembly, and the complex MEP (Mechanical, Electrical, Plumbing) hookups. We don't pack up and leave until every system is tested, proven, and 100% ready for your workforce.
A Complete Camp Ecosystem: More Than Just Accommodation
A productive workforce is a well-supported one. Our turnkey solutions integrate all the facilities required for a modern, efficient, and habitable remote-site operation.
Workforce Accommodation
Operational Buildings
Support & Utility Facilities
Welfare & Recreation
Complete Infrastructure (MEP)
What "Turnkey" Actually Means in the Real World
| Metric | Apec Modular Turnkey Solution | Traditional Multi-Vendor Method | 
| Accountability | Single Point of Responsibility. One call resolves any issue. | Fragmented Responsibility. Contractors often blame each other for delays. | 
| Schedule | Accelerated Timeline. Up to 50% faster due to off-site manufacturing. | Long & Unpredictable. Delays from weather, labor shortages, and poor coordination. | 
| Budget | Cost Certainty. A firm, all-inclusive price agreed upon upfront. | High Risk of Overruns. Unforeseen site issues, logistics costs, and change orders. | 
| Quality | Consistent ISO-Standard Quality. Factory-controlled precision and safety. | Variable Quality. Depends on the skill of multiple, separate on-site contractors. | 
Proven Solutions for Demanding Industries
We design and deploy turnkey camps for the world’s most challenging sectors:
Mining & Exploration
Oil & Gas (Onshore/Offshore)
Heavy Construction & Infrastructure
Our Project Portfolio: Proof in Practice
We have delivered complex modular solutions to some of the world’s most recognized brands and critical organizations. Our experience spans from industrial facilities to large-scale accommodation and military mobilization.
| Company | Status | Project Name | Location | Project Area | 
| Migros | Completed | Store and Warehouse Buildings | Turkey | 4.000 m² & 200 m² | 
| Unilever | Completed | Lipton Storage Space | Turkey | 2.200 m² | 
| Coca Cola | Completed | Bottling Plant | Turkey | 14.000 m² | 
| Doğanlar Holding | Completed | State Structure | Dakar / Senegal | 55.000 m² | 
| Carrefour | Completed | Store | Turkey | 2.800 & 2.050 m² | 
| Millennium Hotels | Completed | 7-storey Hotel Building | Gine | 7.000 m² | 
| Nato (Canadian Army) | Completed | Military Mobilization | Latvia | 5.500 m² | 
| Libya Ministry of Religious Affairs | Completed | Administrative Building | Libya | 5.500 m² | 
| Polisan | Completed | Office Building | Turkey | 800 m² | 
| Eti | Completed | Warehouse Building | Turkey | 1.000 m² | 
| JCB | Completed | PDI Building | Turkey | 720 m² | 
| Siemens | Completed | Warehouse | Turkey | 750 m² | 
Stop Managing Chaos. Start Your Project.
Your core business is mining, energy, or construction—not camp logistics. Hand over the most complex, high-risk part of your mobilization to a team that does this, and only this, every single day.